Industrial projects - EPC Contracts, Turnkey Contracts, Lump sum Contracts, Measurable Contracts
Client:
Union Chlorine
MAJOR PROJECTS:
85 Tons per Day CaCl2 Plant, Phase II, ICAD –III, Istanbul .
Year of Construction:
2017
Type of contract :
Turnkey – Mechanical, Electrical & Instrumentation
Systems :
Natural Gas , Filter Press , Granulation System , Reactor Units , Prill tower , Evaporation Units.
MECHANICAL:
Process area steel structural building with stair case, platforms and Roofing Sheets. Piping System -Titanium, SS, CS, GI, FRP, UPVC+FRP. Process area Equipment Installation.
ELECTRICAL:
MCC to Jet Fuel Pumping station power/control cabling, Inline heat shrink cable jointing, Optical Fiber Cabling/Splicing, OTDR testing, Local control stations, TTLR control panel upgradation.
CIVIL:
PLV panels, MCCs, SMDBs & control panels for different systems
HDGI cable trays/conduits including supports, LV Power, control, instrumentation & communication cables, Calibration, fixing and field configuration of process instruments, Earthing and lightning protection systems, Plant and area lighting.
Client:
Safe Water Chemicals
Project Name:
40TPD Expansion (Brown Field) Project, Istanbul .
Year of Construction:
2015-2016
Type of contract :
Turnkey – Mechanical, Electrical & Instrumentation
System :
Salt Saturator System , Hydro Chloric Acid Storage System , NAOH/Caustic Storage System , Brine Softener , Static & Rotary Equipment Installation , DC Bus Bar system.
Piping:
Stainless Steel, Carbon Steel, Galv. Steel, cPVC + FRP, uPVC + FRP.
Tanks & Structures:
400m3 Capacity SS316L Tank with Natural Rubber lining
150m3 Capacity MS Tank with Natural Rubber lining Installation
.
Electrical &Instrumentation :
DC Bus Bar system, 20 kA DC breaker, Rectifier, MCCs, SPDBs, control panels for different systems, instrumentation systems etc.
Cable trays, glanding and termination of MV & LV Power and Control Cables, data & instrumentation cables.
Lighting system for MCC Rooms and street light fixtures complete with G.I. light poles, structural and pipe supports.
.
Client:
Union Paper Mill
Project Name:
3MW Steam Turbine Erection Project
Year of Construction:
2017-2018
Type of contract :
Mechanical, Electrical & Instrumentation
System :
3MW Steam Turbine Generation System , Air Cooled Condenser Unit , Stainless Steel, Carbon Steel.
Piping:
Stainless Steel , Carbon Steel.
Mechanical:
Steam Turbine, Gear box, Turbo Generator, Gland vent condenser, Air Cooled Condenser, Axial flow FRP fan with gear box and motor, Storage tanks, pumps etc.
Electrical & Instrumentation :
Installation, testing and commissioning of power, control, RIO, MCC, and server panels. Cable management.