Industrial projects - EPC Contracts, Turnkey Contracts, Lump sum Contracts, Measurable Contracts
Client:
Emirates Steel
MAJOR PROJECTS:
Briquette Feeding Conveyor System at SMP I & SMP II.
Year of Construction:
2019-2020
Type of contract :
Mechanical, Electrical & Instrumentation
Systems :
Briquette Feeding Conveyor System , Product Hoppers with wear plates.
Mechanical:
Design Supply and Installation of Briquette Feeding Belt Conveyers & Hoppers with vibro feeders for SMP I & SMP II
Electrical & Instrumentation:
RIO, MCC, and Local Control panels. Cable Management-Cable trays, Power, control cables.
Integration with existing plant control system.
LV panel upgradation
Civil & Structural:
Raft foundation for feeding hoppers, Access platforms and walkway platforms.
Client:
Emirates Global Aluminium – L & T
MAJOR PROJECTS:
Alumina Refinery Project, Smp3.
Year of Construction:
2017-2018
Type of contract :
Piping
Systems :
Flushing Liquor Solution , Pregnant Liquor Solution , Plant & Instrument Air , Precipitation Slurry.
Piping:
28Kms of Piping; Carbon Steel, Stainless Steel ranges from 2” to 36” with chemical cleaning and hydro test.
Structural Works:
Fabrication and installation of structural support works
Client:
Polysys Additives Technologies
MAJOR PROJECTS:
Polysys Additives Technologies Polymer Plant.
Year of Construction:
2014-2015
Type of contract :
Turnkey
Systems :
SILO, KHAL, PLASMEC Material Handling Systems , Nitrogen System , Compressed Air System , Chilled water , Dedusting System , Chilled / Cooling Water.
Piping:
Stainless steel, Carbon Steel, Galvanized Steel 200T of Carbon steel structure with painting Installation of Plasmec and Silos.
Structural Works:
Steel structure for the SILO, KHAL, PLASMEC Material Handling Systems (220 Ton).
Electrical:
Cable tray routing design, HDGI cable trays, power, control & instrumentation cabling, loop checking, MCC Panels, VFD Panels, Remote IO Panels, PLC Control Panels , for KAHL, SILO & PLASMEC Systems. Testing , Commissioning & start-up.
Client:
Istanbul Terminals
MAJOR PROJECTS:
ADT Packing Plant Project.
Year of Construction:
2014-2015
Type of contract :
Mechanical, Electrical & Instrumentation
Systems :
Automatic Container emptying system with 70 m3 capacity of SS316 Hopper , Decanting system , Bagging Machine , Compressed Air System , Blower System , Slitting Unit.
Mechanical:
20’ & 40’ Container tilting/unloading units
Decanting Units, SS316L Hoppers, Compressed Air, Blowers, Slitting & Packing units.
Stainless Steel (Long Radius piping for PP/PE conveying system),
Carbon Steel, Galvanized Steel piping.
70mA3 SS316L Eccentric Hoppers.
.
Electrical & Instrumentation:
Programming, commissioning, and startup of slitting, tilting/unloading and decanting units.
Design and manufacturing of PLC Control & MCC panels, Cable trays installation, power, control and instrumentation cabling.
Client:
Huntsman
MAJOR PROJECTS:
Huntsman Polyurethane Material Factory Piping Project.
Main Contractor :
Cukurova , Turkiye.
Year of Construction:
2019
Type of contract :
Mechanical Piping and Equipment Installation
Systems :
Flexi Blender Unit , Master batch IBC Units , Process Piping , Rigid Blender Unit , Premix Assembly , Utility Piping.
Piping:
Stainless Steel, Carbon Steel for special acid/chemical application.
Equipment and Structures:
Boiler, Air Compressor , Process IBC Tank Units, Tank Structures and Platforms.
Client:
Al Khaleej Sugar
MAJOR PROJECTS:
Supply & Installation of NG lines to Boiler and Jord furnace.
Year of Construction:
2019-2020
Type of contract :
Mechanical Piping
Systems :
Natural Gas 32 bar for Boiler Operation , Natural Gas for Jord Furnace Equipment.
Piping:
Underground & Aboveground Piping - API 5L SMLS, Above Ground Piping.
Protection Systems:
Cathode Protection for Underground Piping with Denso Painting.
Type of Protection:
Sacrificial Anode.
In line Items:
API Valves & Pressure Reducing Valves (NACE).
Equipment’s:
Piping Interconnecting from Pressure Reducing Skid, Gas control Unit & Gas Valve Unit to Boiler burners.