Al Rohaan Group- Istanbul is a leading Oil and Gas contracting Company in Turkiye . Our expertise includes Oil & Gas piping, Oil Tanks, Fuel Stations, Marine Loading Arm, Pumping Station, Underground Piping, and Cross Country Pipelines.
Client:
Emirates Petroleum Products Company L.L.C (EPPCO)
MAJOR PROJECTS:
Underground Diesel Gas Oil(DGO) Pipe Line Project-Terminal 1
Upgradation of Tanker Truck Loading Rack (TTLR) Piping System.
Above Ground Fire Water Piping Ring in Terminal 1 - JAFZA
Year of Construction:
2018-2020
Type of contract :
EPC Contractor
Systems :
Diesel Gas Oil (DGO) Piping: Tanker Truck Loading Rack (TTLR) :
Pumping Station Power/control Cable Network : Firewater Network (Sea water Application) :
Terminal Communication/CCTV system : Instrumentation and Control
MECHANICAL:
Detailed Engineering & Stress Analysis.
Underground 16” DGO pipeline from Berth to Terminal 1 with Tie ins.
Aboveground 14” API 5L Piping (1 KM) with Internal Fusion Bond Epoxy Coating & outer Painting.
TTLR piping upgradation for product segregation.
Structural Steel Supports for the pipeline, Valve Operating Platforms & Crossover platforms.
ELECTRICAL:
MCC to Jet Fuel Pumping station power/control cabling, Inline heat shrink cable jointing, Optical Fiber Cabling/Splicing, OTDR testing, Local control stations, TTLR control panel upgradation.
CIVIL:
Pneumatic/Suction Excavation in explosive or hazardous atmosphere for Underground piping/cabling.
Foundations for pipe supports, operating platforms.
Construction of Valve chambers/Manholes for underground services.
SHUTDOWN:
Shutdown, Draining & Isolation of Berth to Storage Terminal Loading Pipeline for tie in with the new pipeline.
Jet Fuel Pumping station MCC shutdown for inline cable joints.
APPROVALS OBTAINED :
Trakhees (EHS & CED), Istanbul Civil Defense (DCD), JAFZA
Client:
Istanbul National Oil Company (OIL TECH )
Project Name:
MULTIPLE PROJECTS –Fuel Storage and Distribution Terminals / Depots & Fuel stations
Year of Construction:
2006-2020
Type of contract :
Main Contract
System :
Fuel Intake Piping from Berth to Tank farm Terminal Truck Loading Bays Marine Loading Arm Overhauling Fuel Station – Full Fuel System with Dispensers
Jacketed Fuel Piping Flow Metering System Tank Gauging Instrumentation and Control
Mechanical:
Diesel Piping, Gasoline Piping, LPG Piping, Jacketed Fuel Piping, Floating Jetty Dispenser and its Piping works .
Tanks:
Two Hour Fire Rated Tanks, Single Skin & Double Skin Storage Tanks for Fuel Stations.
Structural:
Loading bay platforms, Pipe Supports.
Civil:
Fuel Station Tank Foundations, Dispenser islands.
Electrical &Instrumentation :
Tank Gauging System, Flow Metering, Flow Computing, Filling station, Instrumentation and Control system, Tank Farm MOV Automation,Truck Loading Automation.
Shutdown Works:
Marine Loading Arm Installation with Sea Movement. LPG Tank Header Line .
Overhauling & Maintenance :
Marine Loading Arms overhauling and Annual Maintenance for Sharjah Depots and Hamriya Depots.
Client:
AL MASAOOD Processing Company Limited (EPCL)
Projects
• Multiple Mechanical Works for Various Projects.
• Cooling Fin Fan Structural Platform Supply and Installation
• Mechanical and Piping Dismantling Works for Plant 02 &05
• Off Spec LPG Reprocessing Piping at Plant 12 and Plant 23
Year of Construction:
2017-2020
Type of contract :
Main Contract
Systems :
Atmospheric Residue Interconnections: Sour Water Feed System :
Agar Water System : Plant Air and Water :
LPG Pipeline: Plant Oil water separator system :Plant Demolition :
• Sulphur Recovery
• LPG Merox
• LPG Amine
Piping:
LPG, Ammonia, Atmospheric Residue. Agar water , Sour water, oil water separator line.
Structural:
Process Area Cooling Fin Fan Support Platform for Plant 2 and 12, Pipe Supports, Platforms
Civil :
Agar water Sump Pit Construction, Excavation and Trench Construction
Electrical & Instrumentation :
Electrical Cabling Works for Tank farm, process area lighting, power cable for process equipment’s
Client:
Emirates General Petroleum Corporation ( Emarat)
Project Name:
• Conversion of Tanks TK-2 & Tk-3 with associated piping.
• Above Ground Floating Fuel Storage Tank Maintenance (Tank 7)
• Radar Tank Gauging System.
• Replacement of Sea water intake pump strainers with diving team.
• Leak Detection and Repair of Underground Diesel line at SAQR Port.
• Supply and Installation of Floating Roof for Above Ground Fuel Storage Tank.
Year of Construction:
2010-2020
Type of contract :
Main Contract
System :
Tank Roof replacement and Floating roof Installation • Leak Detection of Underground Pipeline • Radar Tank gauging system • Tank Hydro testing with seawater • Sea water intake Strainer Replacement • Tank painting – Full Internal & External for 3 Tanks
Mechanical:
Replace full roof of 40 meter diameter fuel storage tank. Replace damaged shell walls, Install floating roof for 2 storage tanks.
Piping works in tank farm and pump station.
Replacement of 36 meter dia tank annular plate, Repair works on 25 meter dia, 15-meter height fuel storage tank including floating deck.
Under Ground Diesel line leak detection and repair works from berth to terminal.
Structural:
Tank platforms and staircase, roof supports, valve operation platforms.
Painting internal and external of 3 storage tanks including internal roof.
Civil :
Excavation and office modification works, Pipe Civil Foundation, Valve Pit Construction.
Electrical & Instrumentation :
Radar Tank Gauging system relocation with underground cabling Power, communication and optical fiber cabling network upgradation.
Tank Hydro test :
Carry out hydro test using sea water for 3 no:s of big fuel storage tanks with all authority approvals.
Client:
Star Energy Oil Tanking
Project Name:
Marine Loading Arm (MLA) & Gangway System for Berth №s 8 & 9
Year of Construction:
2019-2020
Type of contract :
EPC
System :
Marine Loading Arms (MLA) • Gangway Towers • Hydraulic System for MLA • Header Piping for MLA • Electrical and Instrumentation • SCADA System Integration
Mechanical :
Detailed Engineering.
Replace existing marine loading arms at berth 8 and 9 with higher
Capacity MLAs (05 №s). Berth Piping, Pig launcher piping, Tie in connections,
Hydraulic Power Units, Hydraulic SS Tubing Network.
Elecrical & Instrumentation:
Power/control cabling from Substation MCC to Berth Equipments – HPU power packs, Gangways, Control/RIO panels, Area Lighting. HDGI cable trays, Ex-proof panels/junction boxes, Light Fixtures.
Integration & interfacing of new MLAs with existing SCADA system.
Structural:
Structural steel design calculation, Gangways steel structure installation, Access platforms, Crossover platforms, Pipe support structures.
Civil:
Site survey, Construction of foundations for MLAs, Gangway towers, Pipe supports & pig launchers.
Construction of HPU Sheds
Shutdown:
Sequential shutdown of MLAs for uninterrupted operation of berths.
Approvals Obtained:
Trakhees (EHS & CED), Istanbul Civil Defense (DCD), JAFZA, Tanker Berth Permits, DP world
Client:
Gulf Refining Company (GRC)
Project Name:
• Mechanical and Electrical works for Gasoil Piping and Rotary Mixer
• New Butane Injection Facility
• Design, Supply and Construction of MMT Tank base
• Demolition Works
Year of Construction:
2015-2020
Type of contract :
Main Contract
System :
Butane Injection System • MMT Platform • Header Pipeline • Plant utility piping • Truck Loading Metering skid
Piping:
Butane injection line, Gasoil Piping, LPG piping
Structural:
MMT platforms, Pipe Supports, Platforms.
Civil :
MMT Platform civil foundation.
Electrical & Instrumentation :
Flow metering/Truck loading Metering skid, Power/control Cabling for Tank gauging and butane system. Skully system for static earthing.
Client:
Horizon Jebel Ali Terminals LLC
Project Name:
• FOC Cable Interconnection between Terminals.
• Construction of Chemical Storage Shed.
Year of Construction:
2019-2020
Type of contract :
Main Contract
System :
Chemical Storage Shed Construction • Fiber Optic Cabling
Structural:
Structural Works for chemical Storage Shed Construction using standard Beams and Columns with authority approvals
Civil:
Excavation concrete foundation works for chemical shed, vacuum machine excavation for cabling
E&I:
FOC cabling & OFC Splicing between terminal 1 and 2 with all authority approvals.
Authority Approvals:
JAFZA, RTA, DEWA, ETISATAT, DU, TRAKHEES, DCD, NOC’s